
The backbone of grid-scale BOS.
Pre-validated configurations for solar, wind, and hybrid installations. Spec sheets and the full configurator are launching soon.
What's shipping at launch
Full launch coming soon.
Electrical BOS: combiner boxes, disconnects, and switchgear assemblies with pre-validated configurations.
BOS represents 30–40% of project cost and schedule risk. PrimeLink approaches that gap as a systems engineering problem — not a parts list.
Structural BOS: mounting systems and racking with load-path documentation for major terrain types.
At launch: complete spec-sheet library, pre-validated BOS configurations, and a project configurator built for EPC procurement workflows.
Control BOS: SCADA-ready enclosures and integration packages for grid-tied hybrid systems.
Get spec sheets on day one.
Leave your details and we'll reach out the moment the full library and configurator go live. Active EPC project inquiries welcomed now.
